Airport Development

Airport Development

Airport Capital Improvement

Year Project
2025 Taxiway A3, A5 & A6 Rehab
2026 Taxilane, bypass, install fire hydrants
2027 N/A
2028 RWY 11/29 Rehab Design
2029 LED Lighting System & Rehab of RWY 11/29
2030 Taxiway A & Main Apron
2031 N/A
2032 Master Plan w/ AGIS

Long Term Project Goals

  • Pavement Maintenance
  • Wildlife Fence
  • Runway 29 Runup Area
  • Apron Rehab

Construction and Crane Information

A map showing an area within which anyone conducting a project or erecting a crane would need to check to see if they are required to file form FAA 7460-1.


Anyone conducting a project or erecting a crane within the highlighted area should utilize the Federal Aviation Administration’s Obstruction Evaluation / Airport Airspace Analysis Pre-Screening Tool to see if they are required to file form FAA 7460-1.